No third-party delay
The electrician is on our team and on our schedule, so first fix happens in the right week and the job keeps moving.
Lighting, extraction, showers and shaver points installed to bathroom zone requirements by a qualified electrician on our team — no waiting weeks for a third party and no half-finished room.
Qualified electrician in-house · every subcontractor vetted and Which? endorsed · £2 million public liability insurance
In-house
Qualified electrician on our own team
Which?
Trusted Trader endorsed, subcontractors vetted
£2 million
Public liability insurance
9.83 / 10
Checkatrade score across 172 reviews
1 year
Guarantee on parts and workmanship
Bathrooms are the most tightly regulated room in a house for electrical work, because water and electricity are separated only by correct product selection and correct positioning. Fittings are governed by zones measured from the bath and shower, which determine what may be installed where and to what protection rating. Lighting, extraction, electric showers, underfloor heating, shaver points, heated mirrors and towel rails all have to be specified and positioned against those rules.
Our qualified electrician works as part of the Four Seasons Bathrooms team, on the same schedule as the plumbing and tiling. That matters practically: first-fix wiring has to happen while walls and floors are open, before boarding, tanking and tiling. When the electrician is a separate contractor booked independently, that window is the thing that slips — and a bathroom cannot be finished around missing cable.
The electrical work is included in the fixed price for a full bathroom or kitchen installation. Standalone electrical work — replacing an extractor, adding mirror lighting, changing an electric shower, dealing with a shaver point — is quoted or charged at an hourly rate depending on scope, and quotes are always free.
Get my fixed-price quoteElectrics scheduled inside the same job so first fix happens at the right moment and nothing waits on an outside contractor.
Downlights, mirror lighting and properly sized extraction fitted into an existing room to deal with dim light and persistent condensation.
Where an existing unit has failed, the cable and protection have to be right for the rating of the new shower, not just the old one.
Underfloor heating, heated towel rails, heated mirrors and shaver sockets installed in the correct zone with appropriate protection.
In a bathroom the consequences of a poor electrical decision are immediate and physical. A fitting installed in the wrong zone, or without the ingress protection that position requires, sits in a place where it will regularly meet steam and spray. Moisture in a fitting or a junction leads to corrosion, tracking, tripping circuits and, in the worst case, a shock risk in a room where the occupant is wet and barefoot.
The other failure is quieter but affects every bathroom eventually: inadequate extraction. An extractor that is undersized, ducted into a loft void instead of outside, or wired so it never runs long enough to clear the room leaves moisture in the air. That moisture goes into plaster and grout. Mould appears in corners and along sealant lines, paint peels, and the room that was refitted two years ago starts to look tired. Homeowners usually blame the tiling or the sealant when the real cause is ventilation.
Cable sizing on high-load items is the third area where corners get cut. Electric showers and underfloor heating draw significant current, and a circuit that was adequate for the old unit may not be for the new one. Under-rated cable and inappropriate protection cause nuisance tripping at best and overheating at worst. None of this is visible after the tiles go on, which is exactly why it needs doing correctly the first time.
01
We look at the existing circuits, consumer unit, extraction route and the positions you want lighting, heating and controls, then confirm what is achievable in the room's zones.
02
Fittings, protection, cable routes and duct runs are specified and included in the fixed price for a refit, or quoted separately for standalone work.
03
Cables run, back boxes set, extraction ducting installed to outside and underfloor heating mats laid before boarding, tanking and tiling begin.
04
Lighting, extraction, showers, shaver points, mirrors and heating controls fitted and connected once the room is tiled and decorated.
05
Circuits are tested, protection verified, extraction checked for actual airflow, and controls demonstrated at handover. Parts and workmanship carry a one-year guarantee.
The electrician is on our team and on our schedule, so first fix happens in the right week and the job keeps moving.
Products chosen for where they are actually going, with appropriate protection, rather than whatever looked good in the showroom.
Extraction sized for the room and ducted to outside air, which is the single most effective way to protect new plaster, grout and paint.
Electric showers and underfloor heating installed on cable and protection matched to their rating, not inherited from the previous unit.
Plumbing, electrics and tiling all sit with one contractor, so nobody can blame the trade before them if something is not right.
£2 million public liability insurance, Which? Trusted Trader endorsement, vetted subcontractors and a one-year guarantee on parts and workmanship.
These are the electrical elements that come up most often on installations across Ampthill, Flitwick, Bedford, Luton and the surrounding towns, and what each one needs to be right.
Bathroom zones are measured from the bath and shower and dictate what may be installed at each position and to what protection rating. Every light, socket, switch and heated item is selected against the zone it lands in, and pull cords or remote switching are used where a wall switch would not be permitted.
Downlights positioned to light the room evenly rather than in a single central pool, with separate mirror or shaver lighting where a face needs to be lit properly. Dimmable and colour-temperature choices are worth making before first fix because they affect the fittings and switching used.
Extractor selection is a function of room size and shower use. Timer overrun, humidity sensing and inline fans all have their place. The duct run matters as much as the fan: the shortest practical route to outside air, properly supported and terminated, with insulated duct through cold voids to stop condensation forming inside it.
Electric showers need cable, protection and isolation matched to their kilowatt rating and the run length. When replacing an old unit, the existing supply is assessed before a new shower is chosen, not after it has been bought.
Electric underfloor mats are laid at first fix under the tiled floor with the sensor positioned so it can be replaced, and controlled by a thermostat outside the wet zone. Heated towel rails can be plumbed, electric or dual fuel, which changes what has to be provided at first fix.
Appliance circuits, isolation for built-in appliances, socket positions planned around worktop use, under-cabinet lighting and extraction. All of it set out before units are fixed, because a socket behind a cabinet is useless.
In older Bedfordshire properties the existing circuits and consumer unit may not support what is planned. We assess that at survey and tell you honestly what needs upgrading before we start, rather than adding load to an installation that cannot take it.
Anything not covered here, call Owen McDonagh on 07533 646033 and ask. Quotes are free and the phone is monitored 24/7.
See everything we cover, read more customer reviews or go back to the homepage.
Based in Ampthill, Bedfordshire, we carry out electrics across the county and into north Hertfordshire.
Book a free survey and our electrician will confirm what your room and your existing circuits can take, with the price included in one written quote.
Need someone today?
Emergency cover runs 24/7 at £120 per hour and the phone is always monitored.
07533 646033£2m public liability insurance · Which? Trusted Trader · 9.83/10 on Checkatrade
Request Your Free Estimate
Tell us about the job — we'll come out, measure up and send one fixed price.