One price, agreed up front
The fixed price is set after we have seen the room, not estimated from a photograph, so the budget you plan around is the budget you pay.
A finished bathroom you can use in weeks rather than months — strip-out, plumbing, electrics, plastering, tiling and final fit handled in-house, priced before we start, with nobody to chase and no gaps between trades.
9.83 out of 10 across 172 Checkatrade reviews · no bad reviews in seven years of trading
25+ years
Qualified plumbing experience since 1998
9.83 / 10
Checkatrade score across 172 reviews
£2 million
Public liability insurance
1 & 2 years
Guarantee on plumbing and parts, and on tiling
Which?
Trusted Trader endorsed
A full bathroom installation is far more than swapping a suite. It means stripping the room back, dealing with whatever is found behind the old tiles and under the old floor, reworking hot and cold pipework and waste runs to suit the new layout, wiring lighting, extraction and shower supplies to current standards, boarding and plastering, tiling, then fitting sanitaryware, brassware, screens and furniture so every joint is sealed and every surface is level. Four Seasons Bathrooms carries out all of that with one team: Owen McDonagh, a qualified plumber since 1998 holding an NVQ Level 2 in Plumbing, alongside his own electrician and tiler, with a Gas Safe registered engineer brought in when the boiler or gas work requires it.
That single-team structure is the point. Most bathroom projects do not fail on the tiling or the plumbing — they fail in the gaps, where the tiler is waiting on the plumber, the electrician never turns up and a week disappears with nobody answering the phone. When one person prices the job, sequences it and answers the phone throughout, those gaps stop existing. You deal with Owen from the first survey to the final handover.
We work supply-and-fit or labour-only. If you have already chosen your suite, tiles and brassware, we will fit them. If you would rather we handled the sourcing and specification, we will do that instead. Either way the room is quoted at a fixed price after we have physically seen it, with the honest caveat that genuinely unforeseen problems behind walls and floors can affect the final figure. Quotes are free, and card and bank transfer are both accepted.
Get my fixed-price quoteRooms fitted twenty or thirty years ago, where the suite still works but the tiling, sealant and layout have run out of life. We strip back to sound substrate and rebuild rather than tiling over old problems.
Bathrooms and en-suites brought up to standard before you move in, sequenced so the messiest work happens while the house is empty.
Bath swapped for a walk-in shower, an airing cupboard absorbed to gain floor area, a separate WC opened into the main room, or a second bathroom formed from a spare bedroom.
Durable, straightforward specifications that survive tenants, with the plumbing and electrics documented and guaranteed.
A bathroom is one of the few rooms in a house where poor work stays hidden and then bills you years later. Water finds every shortcut. A shower tray bedded on packers instead of a solid base flexes with each use until the silicone joint splits, and the water goes into the floor rather than the waste. Tiles fixed to unprimed plasterboard behind a shower delaminate quietly, and the first symptom is a stain on the ceiling below. A waste run laid without adequate fall holds standing water, smells, then blocks. None of these show up in the handover photographs.
The financial escalation is the part homeowners underestimate. A failed seal that could have been prevented at first fix turns into replaced floorboards, a re-plastered ceiling, redecoration in the room below and, in the worst cases, an insurance claim with an excess and a raised premium. Where the leak sits near a lighting circuit, it stops being a repair problem and becomes a safety problem. Ripping out tiling to reach a pipe that was buried without an access point can cost more than the pipework itself.
There is also a cost in lost time. A bathroom booked as a two-week job that drifts to eight weeks because trades will not co-ordinate leaves a household sharing one basin, showering elsewhere and losing evenings to phone calls. We price a realistic timescale in writing with the quote rather than an optimistic one over the phone, because a date you can plan around is part of the job.
01
We visit the actual room, measure it properly, look at the existing pipework, waste positions, floor construction and consumer unit, and listen to how you want to use the space. No sales pitch and no obligation.
02
You receive one price for the whole job, supply-and-fit or labour-only, with the scope set out and a realistic start date and duration, so the number is known before anyone lifts a tool.
03
The old room comes out, waste is removed, and pipework, waste runs and electrical circuits are set out for the new layout. Anything unexpected behind the walls is shown to you and priced before it is done.
04
Wet areas are boarded and tanked, walls are made flat and plastered where needed, then our own tiler sets out the tiling so cuts fall where they should and grout lines run true.
05
Sanitaryware, brassware, screens, lighting and extraction are fitted, everything is run and tested for leaks and correct drainage, the room is cleaned, and controls are demonstrated. Guarantee runs from that day: one year on plumbing and parts, two years on tiling.
The fixed price is set after we have seen the room, not estimated from a photograph, so the budget you plan around is the budget you pay.
Plumbing, electrics, plastering and tiling sit inside one team and one schedule, which is why our jobs finish in a run rather than in instalments.
Correct falls, tanked wet areas, properly supported trays and sealed junctions — the details that decide whether a bathroom lasts fifteen years or leaks in two.
One year on plumbing and parts, two years on tiling, backed by £2 million public liability insurance and a Which? Trusted Trader endorsement.
Owen runs every job himself. Questions during the work, and anything afterwards, go to the person who did the pricing rather than into a call queue.
9.83 out of 10 across 172 Checkatrade reviews, five stars on Rated People and no bad reviews in seven years of trading — all publicly verifiable before you commit.
Two bathrooms of the same size can be built to entirely different standards. These are the decisions that separate them, and how we approach each one on installations across Ampthill, Flitwick, Bedford and the surrounding Bedfordshire towns.
Wet areas are boarded with a suitable tile backer rather than standard plasterboard, then tanked with a liquid membrane and reinforcing tape at internal corners and pipe penetrations. Dry zones can be plastered and primed conventionally. Getting the substrate right is the single biggest factor in whether tiling survives, because a tile is only as sound as what it is bonded to.
Low-profile stone resin trays, standard acrylic trays and tiled formers all behave differently. Trays are bedded solid so there is no flex, upstands and seals are formed in the correct order, and enclosure fixings are made into supported substrate. Mixer showers, electric showers and thermostatic bar valves are chosen against the property's water pressure and system type rather than the picture in the brochure.
Hot and cold runs are re-set for the new layout, isolation valves are fitted where they can actually be reached, and waste runs are laid with proper fall to prevent standing water and smells. Where pipework has to be concealed, we leave sensible access rather than sealing in a future repair.
Large-format porcelain, ceramic, mosaic and natural stone each need different setting out, adhesive and support. Our own tiler sets out from the most visible line so awkward cuts land where the eye does not go, uses the correct adhesive bed for the format, and finishes with grout and flexible sealant appropriate to the movement in the junction. Tiling carries a two-year guarantee.
Bathroom electrics are wired by our qualified electrician working to the zone requirements that govern what fitting can go where. Downlights, mirror lighting, shaver sockets, underfloor heating and extraction are planned at first fix, and extraction is sized for the room so moisture leaves the building rather than settling into the plaster.
Compact spaces need short waste runs, doors that clear the sanitaryware and sensible pump or macerator decisions where gravity drainage is not available. En-suites above living rooms get particular attention on waterproofing and pipe noise. Loft and cloakroom installations are planned around joist runs and existing soil stack positions before anything is bought.
A family bathroom takes hard daily use and benefits from robust surfaces and serviceable fittings. Rental properties need durable, replaceable specifications. Period and older Bedfordshire houses often hide lath and plaster, uneven floors and previous DIY plumbing, which is exactly why we survey in person and price honestly rather than assuming a standard build-up.






Anything not covered here, call Owen McDonagh on 07533 646033 and ask. Quotes are free and the phone is monitored 24/7.
See everything we cover, read more customer reviews or go back to the homepage.
Based in Ampthill, Bedfordshire, we carry out bathroom installation & full refits across the county and into north Hertfordshire.
Book a free survey and you will have a written fixed price, a realistic timescale and an honest view of what the room actually needs — no obligation, no sales pitch.
Need someone today?
Emergency cover runs 24/7 at £120 per hour and the phone is always monitored.
07533 646033£2m public liability insurance · Which? Trusted Trader · 9.83/10 on Checkatrade
Request Your Free Estimate
Tell us about the job — we'll come out, measure up and send one fixed price.